Planning vs. Scheduling in Project Controls – Why the Distinction Matters

Introduction :

In project controls, especially in industries like construction, infrastructure, and oil & gas, two terms often get used interchangeably: Planning and Scheduling. While closely related, they serve different purposes and require distinct skillsets. At Alvid Consulting, we work with clients every day to bridge this gap — using tools like Oracle Primavera P6 to turn high-level strategies into detailed, trackable execution plans.

Let’s break down the difference:


 

What is Planning?

Planningis the strategic phase of project controls. It answers:

What needs to be done?

.✅ How will we do it?

Who is responsible?

What are the constraints and assumptions?

Key Components of Planning:

  • Defining the project scope: Using project documentation like SOW and BOQ to identify all deliverables.
  • Developing a Work Breakdown Structure (WBS): Structuring the project into manageable sections.
  • Identifying activities: Listing all the tasks required to complete the project.
  • Estimating durations: Based on experience, productivity rates, and crew availability.
  • Resource Planning: Determining which labor, equipment, and materials are needed.
  • Assigning calendars: To account for working days, shifts, holidays, and exceptions.
  • Risk identification: Documenting risks and considering their impact on scope and time.

In Primavera P6: The planner will use the WBS, Activity Codes, Calendars, and Resources to build the structure of the schedule without assigning specific dates yet.


What is Scheduling?

Scheduling is the process of applying time logic and constraints to the project plan. It answers: ⏱ When will each task start and finish?What is the sequence of work?What is the project duration and end date?Where is the Critical Path?

Key Components of Scheduling:

  • Applying logic relationships: Finish-to-Start (FS), Start-to-Start (SS), etc., to define sequence.
  • Setting constraints: Like “Start No Earlier Than” or “Mandatory Finish.”
  • Running schedule calculations (F9 in Primavera P6): To compute early/late dates, total float, and the Critical Path.
  • Baseline creation: Capturing the approved schedule for future variance analysis.
  • Updating actuals: Regular progress updates to reflect work completed and forecast remaining durations.
  • Schedule performance analysis: Using tools like Earned Value and S-curves.

In Primavera P6: The scheduler will assign logic relationships, run the CPM engine, and generate early/late start/finish dates, float, and critical activities.


Side-by-Side Comparison:

Contenu de l’article

Why It Matters

Many project delays occur not due to poor execution, but because the initial planning lacked clarity or the schedule was built without logic. Merging good planning with sound scheduling creates a realistic, actionable, and measurable path to project success.

At Alvid Consulting, we specialize in both — developing complete integrated project schedules using Primavera P6 that align planning strategy with scheduling precision.


Final Thought

👉 Planning without scheduling is a wish.

👉 Scheduling without planning is a guess.

Success lies in combining both with discipline, structure, and the right tools.

If you’re struggling to build or manage your schedule, or want to develop a solid Integrated Master Schedule (IMS), our team is ready to help.

📩 Connect with us to learn how Alvid Consulting can support your project from concept to completion.


Vous avez plus de questions?

Nos derniers articles

Effective Management of Float in Project Scheduling: Definition, Legal Aspects, Technical Application, and Tools

Effective Management of Float in Project Scheduling: Definition, Legal Aspects, Technical Application, and Tools

Effective Management of Float in Project Scheduling: Definition, Legal Aspects, Technical Application, and Tools 1. Introduction : In project management,…

5 Common Pitfalls That Lead to Construction Claims

5 Common Pitfalls That Lead to Construction Claims

5 Common Pitfalls That Lead to Construction Claims Introduction : In complex construction projects, claims are not merely a risk…

Planning Intelligence : Transforming Your Schedule into a Strategic, Legal, and Financial Asset

Planning Intelligence : Transforming Your Schedule into a Strategic, Legal, and Financial Asset

Planning Intelligence : Transforming Your Schedule into a Strategic, Legal, and Financial Asset Introduction Most project schedules are treated as…

Commentaires

Votre adresse e-mail ne sera pas publiée. Les champs obligatoires sont indiqués avec *

Commentaires

Votre adresse e-mail ne sera pas publiée. Les champs obligatoires sont indiqués avec *